MEGTEC Innovation Cuts Shields Bag & Printing's Energy Bills
Facebook
Facebook
Twitter
Twitter
LinkedIn
LinkedIn
Email
Email
0 Comments
Comments
Shields Bag opted for MEGTEC’s proposed solution, and its staff performed much of the installation in a two-phase approach that minimized production downtime. Engineers for MEGTEC worked on-site during the installation, providing assistance at critical times and with the start-up of the new heat recovery system.
0 Comments
View Comments
Related Content
Comments